What significance is there in gaining the whole world if one loses oneself in the process? Industrial wastewater treatment equipment serves as a vital tool for safeguarding the health of both human living environments and aquatic ecosystems. However, merely employing the correct operating procedures is not enough to ensure that this equipment functions effectively. In fact, equipment malfunctions encountered during daily industrial wastewater treatment operations are often not the result of improper usage, but rather stem from a failure to adopt the correct methods for routine maintenance. Therefore, wastewater treatment equipment must undergo regular and proper maintenance to ensure it remains in optimal working condition and to extend its service life. In this issue, we will discuss the routine maintenance of MBR membranes, aerated grit chambers, biological reaction tanks, blowers, and pumps.


The primary focus of routine MBR membrane maintenance lies in "online cleaning"-a process involving the injection of chemical solutions (specifically, sodium hypochlorite [NaClO] and citric acid) at concentrations of 300–500 ppm directly into the membrane modules for cleaning. Two common methods are typically employed: chemical online cleaning and external immersion chemical cleaning. The decision to initiate cleaning-either in response to an increase in transmembrane pressure during operation or as part of a scheduled maintenance routine-is primarily determined by the degree of membrane fouling observed during operation. First, ensure that the cleaning tank is filled to capacity, and calculate the required dosage of cleaning agents (typically 2 L/m² at a prepared concentration of 500–1000 ppm). Next, shut off the suction pump and the motorized valve located on the suction line; allow the system to rest for one minute before switching off the aeration system. Once the entire volume of cleaning agent has been injected into the membrane fibers, shut off the metering pump and all valves on the chemical injection line. Allow the system to soak for approximately 120 minutes, ensuring that the total contact time between the cleaning solution and the membranes remains within 150 minutes. After 150 minutes have elapsed, open the effluent valve and restart the suction pump; the chemical cleaning process is considered complete once the chemical cleaning solution has been fully discharged. Upon completion, close the aeration valve for the clean water tank and open the aeration valve for the membrane tank. This specific cleaning method is typically employed when the operating negative pressure within the MBR system exceeds -0.05 MPa, or when standard online chemical cleaning procedures fail to achieve the desired results. Close the valves of the membrane module requiring cleaning. After removing the membrane element, rinse the membrane surface with clean water. Next, soak the element in a 2500 solution for 6 to 24 hours, followed by soaking in a NaOH solution (pH=10) for at least 3 hours (or 24 hours or more, if conditions permit), and then rinse with clean water.


If salt scaling is present on the membrane surface, first soak the element in a 0.1–0.5% hydrochloric acid solution for at least one hour before performing the aforementioned procedures. If the cleaning results remain unsatisfactory after the preceding steps, the membrane element may be further immersed in an alcohol solution with a purity of over 90% for 0.5 to 1 minute. (During the alcohol soak, ensure that the water within the membrane lumen is drained; this step helps restore membrane performance.) Finally, place the element in clean water to await re-installation.

Send Inquiry
Contact us if have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!