Before we knew it, autumn had arrived. The piping system-a critical component of industrial wastewater treatment equipment-serves as the vital conduit for processing sewage and plays a pivotal role in the overall operation. During the pipe installation process, particular attention must be paid to the following aspects: The connection of piping should be carefully planned and coordinated concurrently with the positioning of the equipment itself. When positioning the equipment, installers must strictly adhere to the manufacturer's specifications regarding the unit's self-weight and select a crane with appropriate lifting capacity. The installation sequence must follow the site layout diagrams precisely; the orientation of the equipment must not be incorrect, and the spacing between adjacent units must be accurate.
Following the installation diagrams, the connecting pipes should be assembled. Once the equipment is in place, the connecting pipes must be securely fastened using rubber gaskets to ensure that all joints are leak-proof. After the installation of the industrial wastewater treatment equipment is successfully completed and verified to be free of defects, backfilling with soil may commence. The soil surrounding the equipment and filling the gaps must be thoroughly compacted, and the ground surface should be leveled. During the backfilling process, the following precautions are essential: The access manhole cover on the equipment must sit approximately 50 mm above the finished ground level; furthermore, care must be taken to ensure that soil does not obstruct the air vents located on the manhole cover. The site where the industrial wastewater treatment equipment is installed must be graded to prevent water accumulation during rainfall. The effluent discharge pipe must be situated at least 0.4 meters below the ground level. No heavy objects should be placed directly above the equipment, nor should heavy vehicles be permitted to drive over it. Generally, the internal wastewater should not be completely drained from the unit, as this could allow rising groundwater to exert buoyant force and cause the equipment to float or shift.
Once the installation of the industrial wastewater treatment equipment is complete, it must be securely anchored to the concrete foundation slab to prevent it from floating or shifting due to buoyancy. Simultaneously, wastewater must be injected into the equipment until it reaches a fill level of at least 70% to counteract any potential upward lift. Furthermore, all piping connections must be thoroughly inspected for leaks. During water testing, every pipe joint must remain leak-free; additionally, measures must be taken to ensure that rising groundwater does not displace or tilt the equipment.
The above points summarize the key considerations regarding piping installation for industrial wastewater treatment equipment. Integrated wastewater treatment systems consolidate various functional units-including the primary sedimentation tank, Stage I and II contact oxidation tanks, the secondary sedimentation tank, and the sludge tank-into a single, compact unit. These systems typically employ blower-driven aeration within the contact oxidation tanks, thereby effectively combining the principles of the contact oxidation method with the activated sludge process. This integrated design eliminates the complexities and burdens associated with separately commissioning wastewater treatment process designs and undertaking extensive civil engineering construction work.
